Fan Coil Control Valve Arrangement: Five Hookups, One Rule
A fan coil control valve arrangement is the decision about how many valves the coil needs, which circuit each one sits in, where on that circuit it sits, and what has to be piped around it. The valve type can be right, and the arrangement still fail: a correct two-way valve with no isolation valve on either side cannot be replaced without draining the branch.
Selection questions get the attention. Arrangement questions get the callbacks. A valve that is piped in the wrong sequence, or mounted where the actuator cannot be reached, turns a routine service call into a shutdown.
If you are reviewing a submittal, send the valve schedule and coil drawing to our application engineers, and we will mark the arrangement before it reaches site.
Key Takeaways
- An arrangement is defined by four things: the number of pipes, the number of valves, the valve position on the circuit, and the fittings around it.
- Five hookups cover nearly every fan coil: 2-pipe cooling only, 2-pipe heating only, 2-pipe changeover, 4-pipe with two valves, and a packaged changeover set.
- Two-pipe changeover is regulated: at least a 15°F outdoor-air dead band, four hours in one mode, and supply temperatures no more than 30°F apart at changeover.
- Four-pipe with two valves must not heat and cool at once. The prohibition is in the code, and the arrangement is where it is enforced.
- One rule covers valve placement: put it where it can be isolated, drained and serviced, and where condensate cannot reach the actuator.
For more information, the wider architecture is in our guide to HVAC control systems.
What an Arrangement Decides

Four decisions define an arrangement, and they are made in this order.
| Decision | What it changes | What follows from it |
|---|---|---|
| How many pipes reach the unit | One temperature at a time, or both | Coil count, plant configuration, changeover logic |
| How many valves the coil needs | One per controlled circuit | Actuator count, BMS outputs, fail strategy |
| Where each valve sits | Supply or return, before or after the strainer | What the body sees, who can service it |
| What is piped around it | Isolation, strainer, unions, bypass, drain, vent | Whether the unit can be flushed, tested, and repaired |
Two pipes carry one temperature at a time; four pipes carry both, with separate circuits or separate coils. Each circuit gets one valve, so a 4-pipe unit gets two unless a packaged set combines them. The fittings are not accessories: they are the difference between a serviceable installation and one that has to be cut out.
The control points follow from those four decisions. A 4-pipe unit needs two analog outputs and two position feedbacks. A changeover unit needs one output and a mode signal. The BMS point list is a consequence of the arrangement, not a separate design.
The Five Fan Coil Control Valve Arrangements
Five hookups cover nearly every fan coil in commercial work. The table gives the hardware count for each one.
| Arrangement | Pipes | Valves | Actuators | BMS points | Where it is used | Main risk |
|---|---|---|---|---|---|---|
| 1. 2-pipe cooling only | 2 | 1 two-way | 1 | 1 AO, 1 AI | Internal zones with no heating | No heating at the terminal |
| 2. 2-pipe heating only | 2 | 1 two-way | 1 | 1 AO, 1 AI | Perimeter heating | No cooling at the terminal |
| 3. 2-pipe changeover | 2 | 1 two-way | 1 | 1 AO, 1 AI, 1 DI | Small buildings with one plant at a time | Wrong-season operation and condensate |
| 4. 4-pipe, two valves | 4 | 2 two-way | 2 | 2 AO, 2 AI | Most commercial buildings | Simultaneous heating and cooling |
| 5. 4-pipe changeover set | 4 | 2 valves plus bypass, factory assembled | 2 | 2 AO, 2 AI | Retrofit and tight ceiling voids | Mismatch between package and coil pressure drop |
AO is an analog output from the controller, AI is an analog input or position feedback, and DI is a digital input used for the mode signal. A 3-way valve would substitute for a two-way valve in arrangements 1 to 3 where constant flow must be preserved; the choice between them is a separate question, covered in the 2-way versus 3-way comparison.
Two Pipes, One Valve (Arrangements 1 and 2)
The simplest hookup is one valve in one circuit. Cooling only and heating only use the same arrangement; the difference is the water temperature and the fail position.
The valve sits between the isolation valves, downstream of the strainer, with unions on both sides. The coil has a drain at its low point and a vent at its high point. The actuator is wired to the room controller, and the controller is the only thing that decides whether the valve opens.
Two details decide whether this arrangement works.
Port direction. A two-way valve isn’t always symmetric. The body has an arrow, and the arrow points with the flow. Reversing it can make the valve pass, chatter, or fail to close fully.
Body rating for the season. A valve selected for chilled water may not be rated for the heating circuit’s temperature. Check the body’s temperature rating, not just its pressure class. The pressure class matters too. The fan coil control valve range covers DN15, DN20 and DN25 at 1.6 MPa and 2.5 MPa, and the higher class is the one to check against the pump’s shutoff head.
Two Pipes, One Valve, Two Seasons (Arrangement 3)
A changeover system uses the same two pipes for heating and cooling. The plant makes hot water in winter and chilled water in summer, and the same valve on the same coil modulates for both.
The code is specific about the changeover itself. ASHRAE 90.1-2022 §6.5.2.2.2 requires a dead band of at least 15°F outdoor-air temperature between modes, at least four hours of operation in one mode before changing over, and reset controls that keep the heating and cooling supply temperatures at the changeover point no more than 30°F apart (UpCodes).
Those three numbers are a control requirement, but they change the arrangement.
The mode signal has to come from somewhere. Either the plant controller broadcasts the season, or a supply-water sensor decides it. In both cases, the unit controller needs a digital input it can trust, and the valve needs to be forced closed during the changeover.
The coil has to drain and slope. A cooling coil that has been wet all summer will drip when the plant switches. The drain pan, the slope, and the trap are part of the arrangement, not the unit’s cosmetic details.
The valve body must be rated for both seasons. A body that is fine at 45°F chilled water may not be rated for 180°F heating water. Verify the temperature range against both design conditions before the submittal is approved.
The failure mode is predictable. The plant changes over, the mode signal arrives late or not at all, and the valve opens on a heating call while the coil is still full of cold water. The room gets colder, the occupant turns the setpoint up, and the valve opens further.
Four Pipes, Two Valves (Arrangement 4)
Four pipes give the coil a heating circuit and a cooling circuit that can run independently. That independence is exactly what the code restricts. ASHRAE 90.1-2022 §6.5.2.1 requires zone thermostatic control to prevent reheating, recooling, mixing, and any other simultaneous heating and cooling of the same zone (UpCodes).
In a hydronic fan coil, that means the arrangement has to make simultaneous operation impossible, not just unlikely.
A dead band in the controller. The heating setpoint and the cooling setpoint are separated by a band wide enough that a small sensor error cannot put the zone in both modes.
A positive-off on each valve. When the controller is in dead band, both valves are commanded closed. Neither is left at its last position.
A shared room sensor. Two sensors in one room disagree, and the disagreement looks like a simultaneous demand. One sensor, two control loops.
Two feedbacks, not one. The BMS should see the position of both valves. A single status point cannot tell an operator which circuit is open.
The arrangement also decides how the unit behaves when the controller fails. With two normally closed valves, a failed controller leaves the unit with no heating and no cooling, which is safe but uncomfortable. With one normally open heating valve, a failure leaves the perimeter zone warm, which may be the intended winter behaviour. That choice belongs in the sequence, and it belongs in the arrangement drawing.
Four Pipes, a Factory Package (Arrangement 5)
A valve package arrives as one assembly: two valves, a strainer, isolation valves, unions, a bypass, a drain and a vent, with the actuators already mounted and wired. The point of the package is that the joints are made in a factory rather than in a ceiling void.
What the package buys you. One pressure test instead of four. One leak check. A known pressure drop across the assembly. Fewer field joints, which is where leaks come from.
What it costs you. The configuration is fixed. Check the package’s Kv against the coil’s design flow, and check its pressure drop at that flow against the differential the pump can deliver at the worst-case unit. A package that is right for a 4-row coil can be wrong for a 6-row coil.
When it is the right call. Retrofit work, tight ceiling voids, and projects where the labour rate is high and the schedule is short. It is also the easier submittal, because the drawing is the manufacturer’s.
For a deep understanding, please read our article on HVAC sequence of operation.
Supply or Return: Where the Valve Sits

No code requires the valve on one side of the coil. Manufacturer drawings show both. The choice is engineering, and it turns on four things.
| Factor | Valve on supply | Valve on return |
|---|---|---|
| Water temperature at the body | Coldest water in the circuit | Water after the coil, warmer on cooling |
| Condensation on cooling | Highest risk | Lower risk |
| Coil isolation | Coil stays full and connected | Coil can be isolated from the riser |
| Typical drawing | Less common on chilled water | Common on cooling coils |
What can be isolated. Whichever side is chosen, the valve needs an isolation valve upstream and downstream. If only one side can be isolated, the arrangement is wrong regardless of which side the valve is on.
Where the condensate goes. A chilled-water valve body and actuator sit below a coil that may be wet. The placement should give condensate a path that does not run onto the actuator, the terminal box, or the ceiling tile below.
How it gets serviced. An actuator that can be removed without cutting pipe, and a valve body that can be swapped without draining the branch, are worth more than a marginal thermal argument.
One rule covers all four: put the valve where it can be isolated, drained, and serviced, and where condensate cannot reach the actuator. If a drawing satisfies that rule, the side is a secondary question.
What Goes Around the Valve
The valve is the smallest part of the hookup and the one most often installed alone.
Strainer, upstream. The screen should be finer than the valve’s smallest flow passage. A partly blocked strainer starves the coil, the valve hunts to compensate, and the actuator cycles until it fails. Clean the screen after the first flush, then put it on the maintenance schedule.
Isolation valves, both sides. Without them, a failed actuator means draining the branch or the riser. With them, the valve is a 20-minute swap.
Unions, both sides. The valve body has to come out of the line. Unions make that possible without cutting and re-threading.
Bypass, in the right place. In a constant-flow arrangement, the bypass is at the valve, matching the coil’s pressure drop so total flow stays steady. In a variable-flow arrangement with two-way valves, the bypass belongs at the end of the branch, not at every unit, or the pump never sees the flow change it was designed to follow. Either way, the system needs differential pressure control or a pump strategy that prevents dead-head when the valves close, which is the same argument PNNL makes for static pressure reset in air systems.
Drain and vent, at the coil. The drain at the low point, the vent at the high point. Without them, the coil cannot be emptied for a repair or filled without an air pocket.
Reducers, concentric. A valve smaller than the line needs a reducer. Use concentric reducers, and keep them as close to the valve as the manufacturer allows. An eccentric reducer installed flat side up traps air above the valve.
Orientation, Clearance and Condensate
The actuator is the part that fails first, and most actuator failures are environmental rather than mechanical.
Mounting position. Most actuators allow upright and horizontal mounting and prohibit upside-down mounting. Check the datasheet for the model, not for the family.
Cable entry. Point the cable entry down where condensation, washdown, or humid ceilings are possible, and respect the enclosure’s IP rating. Water running along a cable into a terminal box is a common failure that no valve specification prevents.
Clearance. Leave enough room to remove the actuator and, separately, the valve body. A valve that needs the ceiling grid removed to service it will not be serviced.
Insulation. Insulate the body and the pipe, never the actuator. Leave the manual override and the position indicator visible.
Flush, Test and Handover

| Check | What to do | Pass criterion |
|---|---|---|
| Flush | Flush through a bypass, or with the valve fully open and the strainer in place | No debris reaches the seat; strainer cleaned afterwards |
| Pressure test | Isolate the valve if the test pressure exceeds its rating; test the joints | No leaks at joints or unions; valve not over-pressured |
| Stroke | Command 0%, 50%, 100% from the controller | Full travel, feedback follows the command |
| Close-off | Run the pump to its maximum differential | Valve closes fully, no passing, no chatter |
| Fail position | Remove power and, separately, the control signal | Normally closed drives closed, normally open drives open |
| Control | Step the setpoint through the dead band | Valve modulates, not just open and closed |
| Points | Compare the BMS display with the field | Command, feedback, and alarm all correct |
| Label | Tag the valve with the unit it serves | Tag matches the schedule |
The full sequence, including the room controller and the BMS, is covered in the fan coil control system commissioning guide. The room temperature controller is the device that issues the commands in this table.
Five Fan Coil Control Valve Arrangement Mistakes
1. No isolation on one side. The valve fails in July, and the only way to change it is to drain the branch. Two isolation valves cost less than one service call.
2. Strainer downstream of the valve. Debris reaches the seat before it reaches the screen. The valve passes, the coil starves, and the strainer looks clean.
3. A bypass at every unit in a two-way system. The bypass short-circuits the variable flow the pump and the differential pressure control were designed around. The plant runs at constant flow with variable-flow hardware.
4. A three-way valve piped as a mixer when the coil needs a diverting valve at the outlet. The ports are not interchangeable. AB goes to the coil outlet, A to the return, B to the bypass. Get it wrong, and the coil is bypassed when it should be working.
5. An actuator mounted upside down under a wet coil. Condensate follows the cable, the terminal box fills, and the actuator fails in the first cooling season. Mounting position and cable entry are part of the arrangement.
Frequently Asked Questions
Where should a fan coil control valve be installed, supply or return?
Either side can work, and no code mandates one. On chilled water, the return side keeps the valve body warmer and reduces condensation. The stronger criteria are isolation, drain path, and service access: put the valve where it can be isolated on both sides and where condensate cannot reach the actuator.
How many valves does a 4-pipe fan coil need?
Two, one for the heating circuit and one for the cooling circuit, unless a factory valve package combines them. Each valve needs its own actuator and its own position feedback.
Can a 2-pipe fan coil heat and cool at the same time?
No. A 2-pipe unit carries one water temperature at a time, which is why changeover systems need a dead band, a minimum time in each mode, and a mode signal the unit controller can trust.
What is a fan coil valve package?
A factory-assembled set with two valves, a strainer, isolation valves, unions, a bypass, a drain, and a vent, usually with the actuators mounted and wired. It reduces field joints and makes the submittal one drawing instead of four.
Does a fan coil need a strainer before the control valve?
Yes, in practice. The screen should be finer than the valve’s smallest flow passage, and it should be cleaned after the first flush. A blocked strainer is one of the most common causes of a valve that hunts.
Conclusion
An arrangement is four decisions: how many pipes, how many valves, where each valve sits, and what is piped around it. Get those right, and the valve type, the size, and the actuator all have somewhere to work. Get them wrong, and none of them can compensate.
The one rule worth carrying to the submittal review is the placement rule: isolate, drain, service, and keep condensate off the actuator. Everything else in this guide follows from it.
If you are laying out a fan coil valve schedule, the selection and sizing guide covers valve type and Kvs, and the fan coil valve sizing article works through a DN20 example. Send the schedule and the coil drawing to our application engineers, and we will check the arrangement against the fittings.